This 6×3 m raised freestanding deck (18.0 m²) is carried by joists 45×195 at 596 mm c/c on beams 2 × 45×195 and posts 95×95, 6 footings in total. The sizes are calculated for 2.5 kN/m² imposed load and snow zone 2.0 – the cheapest combination of standard timber that passes bending, shear and deflection.
Quick facts
- Area
- 18.0 m²
- Joists
- 45×195 c/c 596
- Beams
- 2 × 45×195
- Posts
- 6 × 95×95
- Footings
- 6
- Boards
- 24
- Total timber
- 77 m
Member sizes
| Member | Size | Utilisation | Governing |
|---|---|---|---|
| Joistsspan 2.91 m · c/c 596 mm · g 0.16 kN/m, q 1.49 kN/m | 45×195 c/c 596 | 75% | deflection |
| Beams2 rows · span 2.80 m between posts · g 0.47 kN/m, q 3.75 kN/m | 2 × 45×195 | 89% | bending |
| Postslength 0.73 m · N 11.8 kN (G+Q) · unbraced, Lef = 2L | 95×95 | 24% | buckling |
Joist size by imposed load
| Imposed load (kN/m²) | Size |
|---|---|
| 2.0 | 45×170 c/c 596 |
| 2.5 | 45×195 c/c 596 |
| 3.5 | 45×195 c/c 496 |
| 4.0 | 45×195 c/c 496 |
Timber list
| Qty | Size | Length | Treatment |
|---|---|---|---|
| 12 | 45×195 | 3.3 m | Pressure treated NTR/AB |
| 11 | 45×195 | 3.0 m | Pressure treated NTR/AB |
| 1 | 95×95 | 4.8 m | Pressure treated NTR/AB |
Good to know
- Fall height over 0.50 m: Swedish building regulations (BBR) require a guard rail (≥ 1.1 m, gaps ≤ 100 mm). Not included – frame only.
FAQ
What size joists do I need for a 6×3 m raised freestanding deck?
45×195 at 596 mm c/c is enough for 2.5 kN/m² imposed load. That uses 75% of the capacity under Eurocode 5.
How big do the beams need to be?
The beams are 2 × 45×195. Always join beams over a post.
How much timber does it take?
The frame takes 24 boards in standard lengths, 77 m of timber in total. The cut list is optimised to keep offcuts small.
How many footings do I need?
6 footings. The most heavily loaded one carries 11.8 kN, which on firm friction soil means a footing of roughly Ø300–400 mm.