6×3 m attached deck – plans, timber list and sizes
This 6×3 m attached deck (18.0 m²) is carried by joists 45×170 at 496 mm c/c on beams 2 × 45×145, 4 footings in total. The sizes are calculated for 2.5 kN/m² imposed load and snow zone 2.0 – the cheapest combination of standard timber that passes bending, shear and deflection.
Quick facts
- Area
- 18.0 m²
- Joists
- 45×170 c/c 496
- Beams
- 2 × 45×145
- Footings
- 4
- Boards
- 20
- Total timber
- 65 m
Member sizes
| Member | Size | Utilisation | Governing |
|---|---|---|---|
| Joistsspan 2.93 m · c/c 496 mm · g 0.13 kN/m, q 1.24 kN/m | 45×170 c/c 496 | 96% | deflection |
| Beams1 rows · span 1.87 m between posts · g 0.45 kN/m, q 3.78 kN/m | 2 × 45×145 | 71% | bending |
Joist size by imposed load
| Imposed load (kN/m²) | Size |
|---|---|
| 2.0 | 45×170 c/c 596 |
| 2.5 | 45×170 c/c 496 |
| 3.5 | 45×120 c/c 596 |
| 4.0 | 45×120 c/c 596 |
Timber list
| Qty | Size | Length | Treatment |
|---|---|---|---|
| 3 | 45×145 | 4.2 m | Pressure treated NTR/AB |
| 4 | 45×170 | 3.3 m | Pressure treated NTR/AB |
| 13 | 45×170 | 3.0 m | Pressure treated NTR/AB |
Good to know
- Ledger: fix it to the house frame (not the cladding) with structural screws/bolts every 400–600 mm and flash above it. The house wall must be able to take the load.
FAQ
What size joists do I need for a 6×3 m attached deck?
45×170 at 496 mm c/c is enough for 2.5 kN/m² imposed load. That uses 96% of the capacity under Eurocode 5.
How big do the beams need to be?
The beams are 2 × 45×145. Always join beams over a post.
How much timber does it take?
The frame takes 20 boards in standard lengths, 65 m of timber in total. The cut list is optimised to keep offcuts small.
How many footings do I need?
4 footings. The most heavily loaded one carries 7.9 kN, which on firm friction soil means a footing of roughly Ø300–400 mm.