5×3 m raised freestanding deck – plans, timber list and sizes
This 5×3 m raised freestanding deck (15.0 m²) is carried by joists 45×170 at 496 mm c/c on beams 45×220 and posts 95×95, 6 footings in total. The sizes are calculated for 2.5 kN/m² imposed load and snow zone 2.0 – the cheapest combination of standard timber that passes bending, shear and deflection.
Quick facts
- Area
- 15.0 m²
- Joists
- 45×170 c/c 496
- Beams
- 45×220
- Posts
- 6 × 95×95
- Footings
- 6
- Boards
- 16
- Total timber
- 58 m
Member sizes
| Member | Size | Utilisation | Governing |
|---|---|---|---|
| Joistsspan 2.96 m · c/c 496 mm · g 0.13 kN/m, q 1.24 kN/m | 45×170 c/c 496 | 98% | deflection |
| Beams2 rows · span 2.30 m between posts · g 0.44 kN/m, q 3.81 kN/m | 45×220 | 95% | bending |
| Postslength 0.73 m · N 9.8 kN (G+Q) · unbraced, Lef = 2L | 95×95 | 20% | buckling |
Joist size by imposed load
| Imposed load (kN/m²) | Size |
|---|---|
| 2.0 | 45×170 c/c 551 |
| 2.5 | 45×170 c/c 496 |
| 3.5 | 45×195 c/c 551 |
| 4.0 | 45×195 c/c 496 |
Timber list
| Qty | Size | Length | Treatment |
|---|---|---|---|
| 2 | 45×170 | 5.1 m | Pressure treated NTR/AB |
| 11 | 45×170 | 3.0 m | Pressure treated NTR/AB |
| 2 | 45×220 | 5.1 m | Pressure treated NTR/AB |
| 1 | 95×95 | 4.8 m | Pressure treated NTR/AB |
Good to know
- Fall height over 0.50 m: Swedish building regulations (BBR) require a guard rail (≥ 1.1 m, gaps ≤ 100 mm). Not included – frame only.
FAQ
What size joists do I need for a 5×3 m raised freestanding deck?
45×170 at 496 mm c/c is enough for 2.5 kN/m² imposed load. That uses 98% of the capacity under Eurocode 5.
How big do the beams need to be?
The beams are 45×220. Always join beams over a post.
How much timber does it take?
The frame takes 16 boards in standard lengths, 58 m of timber in total. The cut list is optimised to keep offcuts small.
How many footings do I need?
6 footings. The most heavily loaded one carries 9.8 kN, which on firm friction soil means a footing of roughly Ø300–400 mm.
Similar plans
The calculations are a design aid based on a simplified Eurocode 5. Connections, foundations and stability must be checked on site – have a structural engineer review the design if a permit is required.