5×4 m raised attached deck – plans, timber list and sizes

This 5×4 m raised attached deck (20.0 m²) is carried by joists 45×120 at 551 mm c/c on beams 2 × 45×195 and posts 95×95, 6 footings in total. The sizes are calculated for 2.5 kN/m² imposed load and snow zone 2.0 – the cheapest combination of standard timber that passes bending, shear and deflection.

Frame drawing: 5×4 m raised attached deck
Frame drawing · 5×4 m raised attached deck · Download drawing (PNG)

Quick facts

Area
20.0 m²
Joists
45×120 c/c 551
Beams
2 × 45×195
Posts
6 × 95×95
Footings
6
Boards
20
Total timber
87 m

Member sizes

MemberSizeUtilisationGoverning
Joistsspan 1.97 m · c/c 551 mm · g 0.13 kN/m, q 1.38 kN/m 45×120 c/c 551 90% deflection
Beams2 rows · span 2.30 m between posts · g 0.55 kN/m, q 4.92 kN/m 2 × 45×195 78% bending
Postslength 0.81 m · N 12.6 kN (G+Q) · braced, Lef = L 95×95 21% buckling

Joist size by imposed load

Imposed load (kN/m²)Size
2.0 45×120 c/c 551
2.5 45×120 c/c 551
3.5 45×145 c/c 551
4.0 45×145 c/c 551

Timber list

QtySizeLengthTreatment
1 45×95 5.1 m Pressure treated NTR/AB
1 45×95 3.0 m Pressure treated NTR/AB
2 45×120 5.1 m Pressure treated NTR/AB
10 45×120 4.2 m Pressure treated NTR/AB
4 45×195 5.1 m Pressure treated NTR/AB
1 95×95 4.2 m Pressure treated NTR/AB
1 95×95 2.4 m Pressure treated NTR/AB

Good to know

FAQ

What size joists do I need for a 5×4 m raised attached deck?

45×120 at 551 mm c/c is enough for 2.5 kN/m² imposed load. That uses 90% of the capacity under Eurocode 5.

How big do the beams need to be?

The beams are 2 × 45×195. Always join beams over a post.

How much timber does it take?

The frame takes 20 boards in standard lengths, 87 m of timber in total. The cut list is optimised to keep offcuts small.

How many footings do I need?

6 footings. The most heavily loaded one carries 12.6 kN, which on firm friction soil means a footing of roughly Ø300–400 mm.